What is a change order? and can I avoid them?
Avoiding Costly Change Orders in Your Kitchen & Bath Remodel
Understanding Change Orders
A kitchen and bath remodel is a major undertaking—far more complex than most homeowners expect. And when projects aren’t properly planned, unexpected costs often show up in the form of change orders.
A change order refers to additional costs incurred after the contract is signed, typically due to unforeseen issues or modifications requested by the homeowner. While some change orders are unavoidable, many are the result of poor planning—not bad luck, Many of these issues can be avoided through a clear design and planning process
Common Causes of Change Orders
- Hidden Structural Issues – Contractors may discover HVAC, plumbing, or electrical systems that need updating once walls are opened.
- Homeowner Modifications – Changing paint colors, swapping out fixtures, or choosing a different tile mid-project all trigger additional costs.
- Low-Ball Bidding Tactics – Some contractors intentionally bid low on incomplete plans, then issue expensive change orders once the project is underway.
- Lack of Detailed Plans – If plans are vague or incomplete, unexpected adjustments can arise, leading to additional expenses.This is why a fully developed home renovation plan is critical before construction begins.
- Appliance & Fixture Compatibility Issues – Not finalizing specifications before rough-in work can result in costly modifications.
How to Avoid Unexpected Costs
✅ Hire the Right Team – Work with experienced designers, architects, and contractors who can anticipate potential issues before work begins instead of piecing together multiple contractors without coordination.
✅ Have a Complete Set of Plans – Avoid bidding on rough plans. The more detailed the plan, the fewer surprises later.
✅ Consider Total Project Costs – Factor in architectural fees, permits, appliances, fixtures, and decorative elements in your budget.
✅ Finalize Appliances & Fixtures Early – Ensure all specifications are confirmed before mechanical and electrical work begins to prevent costly relocations.
✅ Trust the Process – While minor adjustments may be necessary, frequent changes mid-project will lead to unnecessary expenses and delays.
✅ Work with a Unified Team – Using separate subcontractors outside your contractor’s team can lead to miscommunications and added costs.
How a Change Order Works
A change order is a written amendment to your contract. A proper one does four things before any extra work begins:
- Describes the change: exactly what is being added, removed or done differently.
- States the cost: the price of the change, whether it adds to or credits your contract.
- Shows the schedule impact: whether the change adds days, and why.
- Gets signed: by you and the contractor, before the work happens, not after.
If a contractor asks you to approve changes verbally and “settle up at the end,” that’s a red flag. A written change order protects both sides and keeps your budget visible as the project moves.
Change Orders vs. Allowances
An allowance is a placeholder budget in your contract for items you haven’t picked yet, like tile, a vanity or light fixtures. If your final choice costs more than the allowance, the difference shows up later, and it can feel like a change order even though the scope never changed. The fix is simple: make as many selections as possible before the contract is signed, so your price reflects real products instead of placeholders. That’s a big reason we finalize selections during design, as part of our design-build planning process.
What Turns Up When Walls Open in Older Westchester Homes
Many Westchester homes were built before the 1960s, and the most common surprises come from what’s hidden behind plaster and old tile:
- Outdated wiring, like knob-and-tube or undersized circuits that can’t support today’s appliances.
- Old plumbing, such as galvanized supply lines or cast-iron drains near the end of their life.
- Water damage and rot under old bathroom tile or around a leaking sink base.
- Out-of-level floors and walls that need correcting before new cabinets or tile can go in.
- Lead paint or asbestos in older materials, which require safe handling procedures.
These are true unforeseen conditions, not planning mistakes. A good contractor can’t see through walls, but they can warn you which risks are likely for your home’s age and help you budget for them.
How Much Contingency Should You Set Aside?
A contingency fund is money you set aside for the unknowns above. A common guideline is about 10% to 15% of the project cost, and closer to 15% to 20% for older homes or projects that open up walls and floors. For realistic project ranges to build your budget around, see our kitchen and bathroom remodeling pricing guide. If you’d rather spread costs out, remodel financing is another option.
How We Keep Change Orders to a Minimum
- Design before construction. Layout, cabinetry and selections are finalized before we price the build, so the contract reflects the real project. Getting the kitchen layout right early prevents the most expensive mid-project changes.
- One team, start to finish. Design and construction stay under one roof, so nothing gets lost between a designer’s drawings and a contractor’s bid.
- Payments that follow the work. We bill in milestone payments tied to completed stages, so you’re never paying ahead of the work.
- Clear, written changes. If something does change, you see the scope, cost and schedule impact in writing before we proceed.
For more on picking a contractor who plans this way, read how to choose the best kitchen remodeler in Westchester and our take on why even the best-laid plans need a little flexibility. We plan kitchens and baths across the county, including White Plains, Pelham Manor, Larchmont and New Rochelle.
Planning Ahead for a Stress-Free Remodel
Change orders are sometimes unavoidable, but with the right approach, they can be minimized. We prioritize detailed planning and proactive troubleshooting to protect your budget and timeline. By anticipating potential roadblocks upfront, we help homeowners avoid unnecessary stress and unexpected costs. Learn more about our kitchen remodeling services or schedule a consultation to walk through your project before construction begins.
For a clear picture of what projects cost in Westchester before you commit, our kitchen remodeling pricing guide sets realistic expectations. And to see how thorough upfront planning plays out in practice, read about our kitchen renovation in Pelham Manor — a project where a complete plan resolved every decision before construction began.
Thinking about a remodel? Let’s talk! Our expert team is ready to guide you through a seamless renovation process with transparency and precision. Schedule a consultation today!
Frequently asked questions
What is a change order in remodeling?
A change order is a written amendment to your remodeling contract that describes a change in scope, its cost and its effect on the schedule. It should be signed by both you and the contractor before the extra work begins.
Are change orders normal in a kitchen or bathroom remodel?
A few are normal, especially in older homes where hidden conditions show up once walls and floors are opened. Frequent or large change orders usually point to incomplete plans, unmade selections or a low initial bid.
How much should I budget for unexpected costs?
Plan a contingency of about 10% to 15% of the project cost, and 15% to 20% for older homes or remodels that open up walls and floors.
What’s the difference between an allowance and a change order?
An allowance is a placeholder budget for items you haven’t chosen yet. If your final choice costs more, you pay the difference. A change order is a change to the scope of work itself. Making selections before signing reduces both.
Can a contractor charge for changes without a written change order?
They shouldn’t. Every change to scope or price should be documented in writing and approved by you before the work is done, so there are no surprises on your final invoice.